Online information source for semiconductor professionals

The Advanced 200 mm Fab

Popular articles

Micron moving fast on Hynix in Q208 NAND flash rankings, says iSuppli - 19 August 2008

Numonyx to close California Technology Center - 12 August 2008

Qimonda starts major reorganization: exits PC DRAM market - 13 October 2008

Micron close to Inotera share purchase, says Gartner - 06 October 2008

Applied Materials sees higher CapEx spending for 2009 - 15 August 2008

MITCHELL WEISS, PRI Automation, Billerica, MA, USA

ABSTRACT

Device makers must increase the productivity of process tools because of increasing capital costs. The transition to 300 mm wafers is not expected to start until 2001, so the industry must find a way to add incremental capacity. This will require a combination of technology enhancements (shrinks) and productivity improvements (logistics). Technology enhancements can be achieved by the use of deep ultraviolet and copper interconnects. Productivity enhancements can be obtained with the help of guidelines originally devised for 300 mm fabs. These will lead to new automated material-handling systems and new scheduling software. The benefits of applying these to 200 mm fabs are described.
Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

Engineering Manager - Applied Materials - Bangalore, 12 November 2007

Engineering Manager - Applied Materials - Santa Clara, 12 November 2007

Manufacturing Project Mgr - Applied Materials - Shanghai, 07 November 2007

Embedded Control Systems HW & SW Engineer-Semiconductor Processing Equipment! - MKS Instruments, Inc. - Wilmington, 05 September 2007

Principal Embedded Software Engineer - MKS Instruments, Inc. - Wilmington, 05 September 2007

Related articles

Advances in Airborne Molecular Contamination in 300 mm Process Technology - 01 March 2002

High-k/metal gate transistor scaling and device concerns for advanced CMOS device applications - 01 August 2004

Novel electron-beam-based photo-mask-repair technology - 01 March 2004

Tool Order: Semitool secures multiple ‘Raider’ system orders from Korea - 26 June 2008

Buildings for nanotechnology: a look back at the genesis of a new building type - 01 December 2005

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: