Online information source for semiconductor professionals

Short-Interval Detailed Production scheduling in 300mm semiconductor manufacturing using Mixed In-te

Popular articles

Oberai discusses Magma’s move into solar PV yield management space - 29 August 2008

New Product: Applied Materials new EUV reticle etch system provides nanometer-level accuracy - 19 September 2011

‚??Velocity‚?? the new buzzword in Intel‚??s PQS annual awards - 12 April 2012

Applied Materials adds Jim Rogers to Board of Directors - 29 April 2008

TSMC honors suppliers at annual Supply Chain Management Forum - 03 December 2008

Robert Bixby, ILOG Inc., & Rich Burda & David Miller, IBM, U.S.A.
 
ABSTRACT

Fully automated 300mm manufacturing requires the adoption of a real-time lot-dispatching paradigm.  Automated dispatching has provided significant improvements over manual dispatching by removing variability from the thousands of dispatching decisions made every day in a fab.  Real-time resolution of tool queues, with consideration of changing equipment states, process restrictions, physical and logical location of WIP, supply chain objectives and a myriad of other parameters, is required to ensure success-ful dispatching in the dynamic fab environment.
However, the real-time dispatching decision in semiconductor manufacturing generally remains a reac-tive, heuristic response in existing applications, limited to the current queue of each tool.  The shortcom-ings of this method of assigning WIP to tools, aptly named “opportunistic scavenging”[1], have become more apparent in lean manufacturing environments where lower WIP levels present fewer obvious op-portunities for beneficial lot sequencing or batching.
Recent advancements in Mixed Integer Programming (MIP) and Constraint Programming (CP) have raised the possibility of integrating optimization software, commonly used outside of the fab environ-ment to compute optimal solutions for scheduling scenarios ranging from order fulfillment systems to crew-shift-equipment assignments, with a real-time dispatcher to create a short-interval scheduler. The goal of such a scheduler is to optimize WIP flow through various sectors of the fab by expanding the analysis beyond the current WIP queue to consider upstream and downstream flow across the entire tool group or sector.
This article will describe the production implementation of a short-interval local area scheduler in IBM’s leading-edge 300mm fab located in East Fishkill, New York, including motivation, approach, and initial results.
Download Please login to download the paper. No account yet? Please register. It's free!

Related articles

New Product: Optimize 300mm fab tool scheduling every 5 minutes offered by ILOG‚??s Fab PowerOps - 19 October 2006

A New Approach for Scheduling Semiconductor Wafer Fabs - 01 December 2002

Analog Devices lowers analog production costs - 21 December 2009

30mm activity report: January to March 2007 - 01 June 2007

Toshiba & SanDisk stop NAND flash production to reduce supply - 16 December 2008

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: