Online information source for semiconductor professionals

Short-Interval Detailed Production scheduling in 300mm semiconductor manufacturing using Mixed In-te

Popular articles

Micron moving fast on Hynix in Q208 NAND flash rankings, says iSuppli - 19 August 2008

Numonyx to close California Technology Center - 12 August 2008

Qimonda starts major reorganization: exits PC DRAM market - 13 October 2008

Applied Materials sees higher CapEx spending for 2009 - 15 August 2008

Micron close to Inotera share purchase, says Gartner - 06 October 2008

Robert Bixby, ILOG Inc., & Rich Burda & David Miller, IBM, U.S.A.
 
ABSTRACT

Fully automated 300mm manufacturing requires the adoption of a real-time lot-dispatching paradigm.  Automated dispatching has provided significant improvements over manual dispatching by removing variability from the thousands of dispatching decisions made every day in a fab.  Real-time resolution of tool queues, with consideration of changing equipment states, process restrictions, physical and logical location of WIP, supply chain objectives and a myriad of other parameters, is required to ensure success-ful dispatching in the dynamic fab environment.
However, the real-time dispatching decision in semiconductor manufacturing generally remains a reac-tive, heuristic response in existing applications, limited to the current queue of each tool.  The shortcom-ings of this method of assigning WIP to tools, aptly named “opportunistic scavenging”[1], have become more apparent in lean manufacturing environments where lower WIP levels present fewer obvious op-portunities for beneficial lot sequencing or batching.
Recent advancements in Mixed Integer Programming (MIP) and Constraint Programming (CP) have raised the possibility of integrating optimization software, commonly used outside of the fab environ-ment to compute optimal solutions for scheduling scenarios ranging from order fulfillment systems to crew-shift-equipment assignments, with a real-time dispatcher to create a short-interval scheduler. The goal of such a scheduler is to optimize WIP flow through various sectors of the fab by expanding the analysis beyond the current WIP queue to consider upstream and downstream flow across the entire tool group or sector.
This article will describe the production implementation of a short-interval local area scheduler in IBM’s leading-edge 300mm fab located in East Fishkill, New York, including motivation, approach, and initial results.
Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

Embedded Control Systems HW & SW Engineer-Semiconductor Processing Equipment! - MKS Instruments, Inc. - Wilmington, 05 September 2007

Principal Embedded Software Engineer - MKS Instruments, Inc. - Wilmington, 05 September 2007

Yield Ramp Consultant - Synopsys - Austin, 23 August 2007

E Beam Site Engineer - Carl Zeiss SMT, Inc. - San Jose, 10 August 2007

Technical Support Engineer - Carl Zeiss SMT, Inc. - Peabody, 10 August 2007

Related articles

New Product: Optimize 300mm fab tool scheduling every 5 minutes offered by ILOG’s Fab PowerOps - 19 October 2006

A New Approach for Scheduling Semiconductor Wafer Fabs - 01 December 2002

Toshiba & SanDisk stop NAND flash production to reduce supply - 16 December 2008

30mm activity report: January to March 2007 - 01 June 2007

300mm activity report: April to June 2006 - 01 June 2006

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: