Risk Assessment Challenges for the 300mm Fab

Popular articles

Voltaix names Peter Smith as CEO - 09 November 2011

Sematech Litho Forum: Sematech mulling multi-beam mask writer effort - 12 May 2010

TSMC hosts 2008 Green Forum on ‘green’ factories - 31 October 2008

Oberai discusses Magma’s move into solar PV yield management space - 29 August 2008

TSMC honors suppliers at annual Supply Chain Management Forum - 03 December 2008

VINCENT DEGIORGIO, ARUP Risk Consulting, Westborough, MA, USA

ABSTRACT
The first wave of 300-millimetre (300mm) semiconductor wafer fabrication facilities (Fab) is here, complete with Front Opening Unified Pods (FOUPs) and fully Automated Material Handling Systems (AMHS). The huge, several billion-dollar (USD) capital expenditure to build and equip these facilities, and the projected 30–40% cost savings per die, have significantly increased the physical and operational risk exposure. The total dependence on interbay &  intrabay automation presents a serious process interruption risk potential. Other changes in Fab and tool configurations will be highlighted. It is important to note that due to the newness of the 300mm Fab, not all risks have been uncovered and/or fully understood.

Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

No related jobs found, sorry!

Related articles

Fab Revenue Opportunities from Systematic Risk Management - 01 March 1999

Next-Generation Materials in Semiconductor Processing: Manufacturing, Handling and ESH Issues - 01 December 1999

Nearly 50% fall in semiconductor equipment sales, says VLSI Research - 21 November 2008

Securing F2 supply for the semiconductor and TFT-LCD industries - 01 September 2003

New report stresses need for EHS risks assessment with nanotechnologies, backed by Intel Corp - 19 July 2006

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: