Online information source for semiconductor professionals

Resource Optimisation for 300mm

Popular articles

Voltaix names Peter Smith as CEO - 09 November 2011

Sematech Litho Forum: Sematech mulling multi-beam mask writer effort - 12 May 2010

TSMC hosts 2008 Green Forum on ‘green’ factories - 31 October 2008

Oberai discusses Magma’s move into solar PV yield management space - 29 August 2008

TSMC honors suppliers at annual Supply Chain Management Forum - 03 December 2008

JOHN J. PLATA, Texas Instruments Inc., Dallas, TX, USA

ABSTRACT

300mm production factories require billion dollar plus investments in facilities, infrastructure, and manufacturing tools. The facilities, tool sets and manufacturing protocols for 300mm wafer fabs are quite different compared to state-of-the-art 200mm fabs. These factors present both the obligation and opportunity to make a step-function move toward sustainability and lower cost by optimising resources in all areas of the 300mm fab. Texas Instruments has followed a conservative approach to 300mm implementation. Their 300mm strategy relies heavily on expertise from its 200mm fabs, alliances with consortiums, vendors, and subcontractors, and is implemented with a “waste nothing” approach through use of an existing fab shell, and a cautious tool evaluation and selection process. Minimal changes in key utility infrastructure systems reduced risk and added value through shared resources and staged implementation. Use of leading edge fab hardware and software automation, coupled with changes in manufacturing operations offers opportunities for enhanced tool utilisation, better operator productivity, and higher yields.
Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

No related jobs found, sorry!

Related articles

Measurement of conservation of energy by semiconductor manufacturing equipment and setting of target - 01 March 2007

Infineon and Nanya carry-on joint DRAM process development - 29 September 2005

Matheson becomes member of ISMI’s ESH Technology Center - 17 May 2011

Enabling operational excellence through an integrated manufacturing IT baseline - 01 July 2007

TSMC squeezes 28nm node into roadmap for 2010 - 29 September 2008

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: