Online information source for semiconductor professionals

Litho metrology challenges for the 45nm technology node and beyond

Popular articles

Voltaix names Peter Smith as CEO - 09 November 2011

Sematech Litho Forum: Sematech mulling multi-beam mask writer effort - 12 May 2010

TSMC hosts 2008 Green Forum on ‘green’ factories - 31 October 2008

Oberai discusses Magma’s move into solar PV yield management space - 29 August 2008

TSMC honors suppliers at annual Supply Chain Management Forum - 03 December 2008

John A. Allgair, Freescale assignee to International SEMATECH Manufacturing Initiative (ISMI), Austin, TX, USA, Benjamin D. Bunday, Mike Bishop & Pete Lipscomb, International SEMATECH Manufacturing Initiative (ISMI), Austin, TX, USA

ABSTRACT

There are numerous metrology challenges facing photolithography for the 45nm technology node and beyond in the areas of critical dimension (CD), overlay and defect metrology. Many of these challenges are identified in the 2005 International Technology Roadmap for Semiconductors (ITRS) [1]. The Lithography and Metrology sections of the ITRS call for measurement of 45/32/22/18nm generation linewidth and overlay. Each subsequent technology generation requires less variation in CD linewidth and overlay control, which results in a continuing need for improved metrology precision. In addition, there is an increasing need to understand individual edge variation and edge placement errors relative to the intended design. This is accelerating the need for new methods of CD and overlay measurement, as well as new target structures. This article will provide a comprehensive overview of the CD and overlay metrology challenges for photolithography, taking into account the areas addressed in the 2005 ITRS for the 45nm technology generation and beyond.

Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

No related jobs found, sorry!

Related articles

AMD 45nm ramp revisited - 22 October 2007

IMEC and JSR simplify double patterning steps - 14 July 2008

Taking control of the copper process at 65 nmTaking control of the copper process at 65 nm - 01 December 2003

Sidewall metrology technologies for 32nm node and beyond - 01 June 2007

Electrochemical deposition challenges for 65nm - 01 March 2003

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: