Online information source for semiconductor professionals

Improving the interface between process equipment and facility systems through Design for Facilities

Popular articles

Micron moving fast on Hynix in Q208 NAND flash rankings, says iSuppli - 19 August 2008

Numonyx to close California Technology Center - 12 August 2008

Qimonda starts major reorganization: exits PC DRAM market - 13 October 2008

Micron close to Inotera share purchase, says Gartner - 06 October 2008

Applied Materials sees higher CapEx spending for 2009 - 15 August 2008

Allan D. Chasey, PhD, PE, Del E. Webb School of Construction, Arizona State University, USA

ABSTRACT

Semiconductor manufacturing equipment is designed to meet the highly complex challenges of today’s semiconductor market. The focus historically has been on the process capability of the tool. Even though the requirements for the production equipment drive facility design, the impact of the equipment on facility costs is not usually considered in the cost of the process equipment. This paper explores how semiconductor manufacturing equipment can be designed to be more compatible with the facility and infrastructure support systems. By looking at some previously ignored semiconductor manufacturing equipment requirements, which ultimately impacted the facility and drove additional facility costs, some ideas will be outlined on how the interface with the facility and infrastructure systems can be made more effectively.

Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

Factory Start Up Director/Manager (Solar Factory Operations) - Applied Materials - , 07 August 2008

Quality Assurance Engineer - Tokyo Electron Limited - Santa Clara , 30 October 2007

Technical Support Engineer - Carl Zeiss SMT, Inc. - Peabody, 10 August 2007

Electrical engineering - Axcelis - Beverly, 10 August 2007

Senior Applications Engineer - Axcelis - Beverly, 09 August 2007

Related articles

Approved Fume Exhaust Duct – Beyond Minimum Requirements - 01 March 2002

Characterization of Process Emissions Using FTIR Technology – A Case Study: Emissions and… - 01 December 1999

Rapid tool installation: a process for all concerned - 01 March 2006

Pushing the Envelope - 01 March 1999

Intel’s EHS facilities equipment procurement process - 01 December 2006

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: