Online information source for semiconductor professionals

Enterprise-wide 300mm Integration

Popular articles

Voltaix names Peter Smith as CEO - 09 November 2011

Sematech Litho Forum: Sematech mulling multi-beam mask writer effort - 12 May 2010

TSMC hosts 2008 Green Forum on ‘green’ factories - 31 October 2008

Oberai discusses Magma’s move into solar PV yield management space - 29 August 2008

TSMC honors suppliers at annual Supply Chain Management Forum - 03 December 2008

RICHARD WANG, SHELBY LAURENTS & CHARLES LYNN, Fluor Microelectronics

ABSTRACT

Along with traditional engineering, procurement and construction (EPC), the profitable nextgeneration 300mm fab will require the integration of physical, logical and people systems on an enterprise-wide basis. This article looks at the inherent challenges within the fab itself, along with outside-the-industry models that are now being refined to suit semiconductor manufacturers.

Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

No related jobs found, sorry!

Related articles

Tool Order: Rudolph receives multiple software orders from Japanese IC manufacturers - 14 April 2010

CEA-Leti starts ramping 300mm 3D-integration line - 19 January 2011

SEMATECH’s 3D Interconnect program attracts Hynix - 08 March 2011

Tool Order: Altatech to supply Fraunhofer IZM with 300mm CVD system - 16 June 2010

Enabling operational excellence through an integrated manufacturing IT baseline - 01 July 2007

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: