Online information source for semiconductor professionals

300mm fab conversions & the chemispherical challenge – a model case study

01 September 2002 | By Mark Osborne | White Papers > Edition 17, Cleanroom

Popular articles

Micron moving fast on Hynix in Q208 NAND flash rankings, says iSuppli - 19 August 2008

Numonyx to close California Technology Center - 12 August 2008

Qimonda starts major reorganization: exits PC DRAM market - 13 October 2008

Micron close to Inotera share purchase, says Gartner - 06 October 2008

Applied Materials sees higher CapEx spending for 2009 - 15 August 2008

Peter Csatáry & Klaus Kümmerle, M+W Zander Facility Engineering GmbH, Stuttgart, Germany#

ABSTRACT

The transition to 300mm wafers, slowed down by the current semiconductor industry downturn, has prompted IC manufacturers to consider the installation of their initial pilot or low volume production lines in existing facilities. Such wafer fabs were typically constructed over a decade ago, starting in the mid-eighties with production utilising 200mm wafers. A model case study, based on the collective experience gained during wafer fab conversion projects from 200mm to 300mm is described in this article. It covers the project procedures implemented, the major differences that were identified and resolved to enable the conversion, as well as the development of the “chemisphere”, a total contamination control approach to extend compatibility of the facility with process technologies in the sub-100nm range.

Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

Manufacturing Engineer - Axcelis Technologies - Beverly, 14 August 2007

Lead Mechanical Engineer - Carl Zeiss SMT, Inc. - Peabody, 10 August 2007

Sr Analog Design Engineer - AMI Semiconductor - , 10 August 2007

Analog Design Engineer - AMI Semiconductor - , 10 August 2007

Analog Design Engineer - AMI Semiconductor - Sunnyvale, 10 August 2007

Related articles

Cost-Of-Ownership Analysis For 300 mm Lithography Mix-and-Match Applications - 01 June 2000

Extending the Life of Existing Fabs Through Optimization - 01 March 1999

Invisible Hook-up benefits for Infineons 300mm volume production facility - 01 September 2002

Microeconomics of accelerated shrinks in demand-limited markets - 01 September 2002

A Case Study of Furnace Modelling from a Wafer Fab’s Perspective - 01 December 2002

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: