Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Cleanroom arrow Articles arrow Edition 19 - Published July 2003 arrow 19th Edition: Can fab costs be controlled? ...
19th Edition: Can fab costs be controlled? Part 1 Print E-mail
Jul 21, 2003 at 12:00 AM

Mark Osborne, Editor-in-Chief, Semiconductor Fabtech

ABSTRACT

This is the first article in a series that will look at the many facets that make up the design, construction and cleanroom installation aspects of the state-of-the-art 300mm fab. The focus will be on initiatives that help to control the rising costs and maximise the return on investment (ROI). We start the series where all fabs must start, on the drawing board or as we have today the CAD computer screen. Here we interview one of the most experienced and creative fab architects in the world today with no less than 20 fabs to his name. We asked Dr. Alfonso Mercurio President of A.M. Architetti S.r.l, part of the AMA Group, to reveal the often forgotten or underestimated importance of design in fabs of today. 

19th Edition: Can fab costs be controlled? Part 1
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
19th Edition: GSMC – Quality first in the PRC  (21/07/2003)
19th Edition: Downloadable CAD templates – time and labor savings  (21/07/2003)
19th Edition: Methods and devices used in the ROR (rate of rise) system calibration  (21/07/2003)
19th Edition: Securing F2 supply for the semiconductor and TFT-LCD industries  (21/07/2003)
19th Edition: Key challenges in ramping 300mm fabs  (21/07/2003)

Related jobs
Sr. Equipment Engineer-Concept 2 Platform, CVD  (Phoenix, 24/03/2008)
Equipment Service Engineer  (East Anglia, 19/03/2008)
Engineering Project Manager II (tool owner- Product Marketing Engr. Staff)  (Santa Clara, 17/09/2007)
Engineer IV - Electro-Optical Instrumentation  (Methuen, 07/09/2007)
Purchaser  (Stuttgart, 24/08/2007)
Download
Subscribe
300mm