Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Critical Components arrow Articles arrow Edition 24 - Published December 2004 arrow 24th Edition: Enhanced PVD vac...
24th Edition: Enhanced PVD vacuum pumping and chamber design Print E-mail
Dec 11, 2004 at 01:39 PM

Brad Stimson & Alan Ritchie, Applied Materials, Inc., Santa Clara, CA, USA

ABSTRACT

Physical Vapor Deposition (PVD) systems are among the most widely used systems in fabs. To extend PVD technology, a highly successful platform has been redesigned to meet sub-90nm requirements. Over 14 years of being used in production (which continues till today), vast modifications were made to both the PVD mainframe unit and its chambers to keep abreast of ever changing design nodes and device designs. 

24th Edition: Enhanced PVD vacuum pumping and chamber design increases system availability
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
24th Edition: Optimized 300mm vacuumpumping requires an understanding of choices  (11/12/2004)
24th Edition: Management of Copper CMP effluents  (11/12/2004)
24th Edition: X-ray metrology for front-end applications  (11/12/2004)
24th Edition: Advanced CMP consumable design for defectivity control  (11/12/2004)
24th Edition: Breakthrough technology for CMP  (11/12/2004)

Related jobs
Equipment Service Engineer  (East Anglia, 19/03/2008)
Staff Process Engineer  (Portland, 22/11/2007)
Etch Development Engineer  (Portland, 22/11/2007)
Lead Mechanical Engineer  (Peabody, 10/08/2007)
Production Supervisor  (Wilton, 09/08/2007)
Subscribe
300mm