Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Critical Components arrow Edition 36 arrow 36th Edition: Qualification of components for high purity water, chemical an...
Critical Components Product Briefs   RSS Feed
Product Briefing Outline: GF Piping Systems has introduced the new Type 567 Butterfly Valve in large diameter sizes up to 12 inches.  The new corrosion-resistant valve incorporates a double eccentric  Read More
Product Briefing Outline: A unique Roller Pinion System (RPS) from Nexen Group, Inc., allows machine designers to incorporate highly accurate linear and rotary motion-control functions with zero backlash and speeds  Read More
Product Briefing Outline: Entegris has introduced the new Torrento family of high-flow liquid filters that help improve liquid contamination control of nano-scale particles in wet etch and clean (WEC) manufacturing  Read More
36th Edition: Qualification of components for high purity water, chemical and slurry systems Print E-mail
Apr 07, 2008 at 04:45 PM

Gary Van Schooneveld, CT Associates, Inc., Minnesota, USA

ABSTRACT

The reduction in semiconductor device critical dimensions puts pressure on the suppliers of fluid handling components and systems to continuously reduce their contamination contribution.  The ITRS’ (International Technology Roadmap for Semiconductors) critical particle dimension for a number of devices is below the detection limit of commercially available particle counting instruments.  Industry standard test methods such as SEMI F57 and F40 have not necessarily kept up with the requirements being identified by the ITRS and end users. 

36th Edition: Qualification of components for high purity water, chemical and slurry systems
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
36th Edition: 300mm Prime and the road to 450mm - Part 1  (07/04/2008)
36th Edition: Front End surface preparation comes of age  (07/04/2008)
36th Edition: High-k metal gate materials and processes for 32nm technology  (07/04/2008)
27th Edition: SEMI® F57-0301 and beyond:Advancing standards  (21/08/2005)
9th Edition: Efficient Qualification of PFA Distribution Systems Using 0.49% HF and DI Water  (04/11/1998)

Related jobs
Senior Building Services Engineer   (Greenock, Scotland, 16/04/2008)
Test Engineering & Project Management  (Cheseaux, Switzerland, 21/02/2008)
IC Failure Analysis Engineer  (Los Angeles, 31/01/2008)
Sales Engineer  (Stuttgart, 16/08/2007)
Lead Mechanical Engineer  (Peabody, 10/08/2007)
Subscribe
300mm