Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Cleanroom arrow Edition 09 arrow 9th Edition: Effective Construction Cost and Schedule Control
Cleanroom Product Briefs   RSS Feed
Product Briefing Outline: The HTZ Smart ‘HART’ Humidity and Temperature Transmitter from Moore Industries simultaneously measures temperature and humidity in processes that require extremely close monitoring of humidity, temperature and  Read More
Product Briefing Outline: NEHP has introduced a family of modules that help tool installers dramatically decrease the time, cost and complexity of a fab installation. The new line features a  Read More
Product Briefing Outline: Purafil has introduced its 2nd Generation MediaPAK Disposable Plastic Module for clean air filtration systems. The module features the new Taper Fit Closure (TFC), which offers  Read More
9th Edition: Effective Construction Cost and Schedule Control Print E-mail
Nov 04, 1998 at 10:58 AM

M. EL-MASHALEH, Royal Corps of Engineers, Jordan Armed Forces, Jordan
DR. A.D. CHASEY, Arizona State University, Tempe, AZ, USA

One of the most important challenges facing construction project managers today is controlling cost and schedule overruns. Cleanroom projects with their associated aggressive schedules and budget limits present management with the tremendous task of tracking resources and developing timely and efficient schedules. A cost and schedule control system must be devised to deliver these projects successfully on time and within budget. Based on a research survey conducted among twenty-two construction management professionals involved in cleanroom construction from general contracting companies and construction management firms, this article defines how construction cost and schedule controls for cleanroom facility projects are accomplished and identifies the keys for effective construction cost and schedule control.

9th Edition: Effective Construction Cost and Schedule Control
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
23rd Edition: Extraction and prediction of effective values for the 45-nm technology node  (21/09/2004)
21st Edition: The more and less of effective overlay control  (19/02/2004)
14th Edition: Cleanroom Protocol Approaches for the Construction Process  (02/07/2001)
12th Edition: Supplier Management for Wafer Fab Construction  (03/06/2000)
10th Edition:Construction Challenges for the 300 mm Fab  (03/06/1999)

Related jobs
Director of Engineering   (Bridgewater, 09/04/2008)
Manager, Facilities and Support Services  (PERRYSBURG, 19/03/2008)
Facility Project Manager  (Salt Lake City, 08/01/2008)
Service Technician  (Stuttgart, 24/08/2007)
Construction Engineer  (Stuttgart, 16/08/2007)
Download
300mm