Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Fab management arrow Edition 32 arrow 32nd Edition: Short-interval detailed production scheduling in 300mm semiconducto...
Fab Management Product Briefs   RSS Feed
Product Briefing Outline: Hach Ultra has introduced the MET ONE 6000 Series Remote Airborne Particle Counters, which offer accurate and reliable continuous particle monitoring. With a sensitivity range of 0.2  Read More
Product Briefing Outline: Numetrics Management Systems has launched ‘NMX-ERP’ 3.0, its next-generation suite of enterprise resource planning (ERP) software for integrated circuit (IC) development organizations. The new software significantly extends  Read More
Product Briefing Outline: Aquest Systems has introduced its new ‘FabEX’ No-Wait-Productivity (SM) Improvement (NPI) solution that is designed optimize material movement in an existing fab by eliminating bottlenecks and congestions  Read More
32nd Edition: Short-interval detailed production scheduling in 300mm semiconductor manufacturing... Print E-mail
Dec 20, 2006 at 05:15 PM

Robert Bixby, ILOG Inc., & Rich Burda & David Miller, IBM, USA

ABSTRACT

Fully automated 300mm manufacturing requires the adoption of a real-time lot-dispatching paradigm. Automated dispatching has provided significant improvements over manual dispatching by removing variability from the thousands of dispatching decisions made every day in a fab. Real-time resolution of tool queues, with consideration of changing equipment states, process restrictions, physical and logical location of WIP, supply chain objectives and a myriad of other parameters, is required to ensure successful dispatching in the dynamic fab environment.

32nd Edition: Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
32nd Edition: 300mm Activity Report: October 2006 to December 2006  (02/05/2007)
32nd Edition: 300mm activity report: October 2006 to December 2006  (02/05/2007)
32nd Edition: What comes after fab-lite? The emergence of focused-manufacturing and collaborative...  (02/05/2007)
32nd Edition: Fabless/foundry DFM: 45nm and beyond  (20/12/2006)
32nd Edition: Site selection for semiconductor manufacturing facilities - current practice and...  (14/12/2006)

Related jobs
Manufacturing Engineer  (South Wales, 31/01/2008)
Production Control Manager  (San Jose, 26/09/2007)
Production Control Manager  (San Jose, 05/09/2007)
Manufacturing Design Engineer  (Tuscon, 01/09/2007)
Senior Production Engineer  (Wilton, 09/08/2007)
Download
Subscribe
300mm