Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Fab management arrow Articles arrow Edition 11 arrow 11th Edition: An Analysis Tool to Determine the Components of...
11th Edition: An Analysis Tool to Determine the Components of Capacity and Cycle Time Print E-mail
Sep 03, 1999 at 02:20 PM
DONALD P. MARTIN, IBM Microelectronics Division, Essex Junction, VT, USA

ABSTRACT

The investment required for a new semiconductor manufacturing line is currently in excess of $2B. Improving asset utilisation by increasing equipment productivity has been a major focus in order to maximise the profit of a line in the face of this significant investment.

A number of methodologies and analysis systems, both home-grown and commercial, have been developed to determine equipment productivity. Most of these analysis tools use data generated solely from this equipment (e.g., down states, up states, number of wafers processed, etc.) to understand the components of equipment productivity.


However, equipment suppliers have been very successful in providing equipment whose availability is usually greater than 85%. As a result, there are other capacity detractors that are as large or larger than those dealing with equipment availability. Examples are idle-no-WIP for cycle time, idle-no-operator due to wait for load/unload, and the effect of mix and volume on batch size. A common characteristic of these capacity detractors is that they occur when the equipment is available to run production.

This paper describes an analysis tool, the capacity and cycle time-throughput understanding system (CAC-TUS), that has been developed and implemented to provide accurate and meaningful capacity loss components, especially when equipment is available to run production. This system combines equipment state data and lot logistical data to determine the magnitude of capacity and cycle time components, including idle-no-WIP and no operator. One of the advantages of this tool is that it greatly reduces the errors associated with operator coding. In addition, it can help determine elements of production such as train size, raw process time, etc. As a result, the magnitude of all capacity loss problems can be accurately measured, the correct owners can be assigned to own and resolve these problems, and efforts to improve capacity can be better focused.

icon An Analysis Tool to Determine the Components of Capacity and Cycle Time in a Semicon. Line
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
New Product: Aquest Systems launches ‘No-Wait-Manufacturing’ 300mm fab AMHS  (14/05/2007)
ISMI tool can help fabs improve energy use, says ASMC presenter   (24/05/2006)
ISMI tool can help fabs improve energy use, says ASMC presenter   (24/05/2006)
Spotfire's interactive analytical software used by Toshiba for yield analysis  (28/11/2005)
12th Edition: Connected at the Chip  (03/02/2000)

Related jobs
Product Marketing Manager  (Santa Clara, 10/11/2007)
Senior Equipment Engineers  (Richmond, 22/10/2007)
System Design Engineer  (San Jose, 26/09/2007)
Electrical Design Engineer   (San Jose, 13/09/2007)
Business Process analyst  (San Jose, 05/09/2007)
Download
Subscribe
300mm