Online information source for semiconductor professionals

Resource Optimisation for 300mm

Popular articles

Micron moving fast on Hynix in Q208 NAND flash rankings, says iSuppli - 19 August 2008

Numonyx to close California Technology Center - 12 August 2008

Qimonda starts major reorganization: exits PC DRAM market - 13 October 2008

Micron close to Inotera share purchase, says Gartner - 06 October 2008

Applied Materials sees higher CapEx spending for 2009 - 15 August 2008

JOHN J. PLATA, Texas Instruments Inc., Dallas, TX, USA

ABSTRACT

300mm production factories require billion dollar plus investments in facilities, infrastructure, and manufacturing tools. The facilities, tool sets and manufacturing protocols for 300mm wafer fabs are quite different compared to state-of-the-art 200mm fabs. These factors present both the obligation and opportunity to make a step-function move toward sustainability and lower cost by optimising resources in all areas of the 300mm fab. Texas Instruments has followed a conservative approach to 300mm implementation. Their 300mm strategy relies heavily on expertise from its 200mm fabs, alliances with consortiums, vendors, and subcontractors, and is implemented with a “waste nothing” approach through use of an existing fab shell, and a cautious tool evaluation and selection process. Minimal changes in key utility infrastructure systems reduced risk and added value through shared resources and staged implementation. Use of leading edge fab hardware and software automation, coupled with changes in manufacturing operations offers opportunities for enhanced tool utilisation, better operator productivity, and higher yields.
Download Please login to download the paper. No account yet? Please register. It's free!

Related jobs

Engineering Manager - Applied Materials - Santa Clara, 12 November 2007

Principal Engineer - FTIR Gas Analysis Algorithms - MKS Instruments, Inc. - Methuen, 07 October 2007

Manufacturing Engineer - Axcelis Technologies - Beverly, 14 August 2007

Lead Mechanical Engineer - Carl Zeiss SMT, Inc. - Peabody, 10 August 2007

Technical Support Engineer - Carl Zeiss SMT, Inc. - Peabody, 10 August 2007

Related articles

Measurement of conservation of energy by semiconductor manufacturing equipment and setting of target - 01 March 2007

Infineon and Nanya carry-on joint DRAM process development - 29 September 2005

Enabling operational excellence through an integrated manufacturing IT baseline - 01 July 2007

Tool Order: Aviza receives multiple etch systems orders from European customers - 27 August 2008

Toshiba notes NAND flash memory price erosion faster than expected - 19 September 2008

Reader comments

No comments yet!

Post your comment

Name:
Email:
Please enter the word you see in the image below: