Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Materials & Gases arrow Articles arrow Edition 14 arrow 14th Edition: Fluids Purity Capabilities or Line Widths: W...
14th Edition: Fluids Purity Capabilities or Line Widths: Who’s Driving? Print E-mail
Jul 02, 2001 at 05:14 PM

Martine Ribeyron & Michel Fuentes, STMicroelectronics, Crolles, France; Alain Ferreres, STMicroelectronics, Rousset, France

ABSTRACT

In the semiconductor field, the ITRS roadmap defines the guidelines for Facilities Fluids Quality, according to the technology node. However direct correlation between fluid purity and line widths/wafer yield is difficult because many other parameters must be considered such as: process recipes, process tools parameters etc. Although changes in technology can sometimes require higher fluid quality, the most daunting task for the Facilities group is to design fluids dispensing systems able to face rapid Fab start up with the required quality. 

14th Edition: Fluids Purity Capabilities or Line Widths: Who’s Driving?
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
14th Edition: ArF Lithography Options for 100nm Technologies  (02/07/2001)
14th Edition: An Ultra-High-Purity Bulk Specialty Gas Package for 300mm Wafer Fabrication  (02/07/2001)
14th Edition: A Comprehensive Approach for Delivery of Low-vapour-pressure Process Chemicals  (02/07/2001)
14th Edition: Cleanroom Protocol Approaches for the Construction Process  (02/07/2001)
14th Edition: Facility Design & Environmental Protection  (02/07/2001)

Related jobs
Solar Applications/Systems Engineer  (Sunnyvale, 04/04/2008)
Sr. Equipment Engineer-Concept 2 Platform, CVD  (Phoenix, 24/03/2008)
Senior Embedded Design Support Engineer  (Shannon, Co Clare, Ireland, 19/03/2008)
HR Director  (Alzenau, 11/03/2008)
Product Marketing Manager  (Tuscon, 14/09/2007)
Blog
Download
Subscribe
300mm