Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Cleanroom arrow Edition 14 arrow 14th Edition: Cleanroom Protocol Approaches for the Construction Process
Cleanroom Product Briefs   RSS Feed
Product Briefing Outline: The HTZ Smart ‘HART’ Humidity and Temperature Transmitter from Moore Industries simultaneously measures temperature and humidity in processes that require extremely close monitoring of humidity, temperature and  Read More
Product Briefing Outline: NEHP has introduced a family of modules that help tool installers dramatically decrease the time, cost and complexity of a fab installation. The new line features a  Read More
Product Briefing Outline: Purafil has introduced its 2nd Generation MediaPAK Disposable Plastic Module for clean air filtration systems. The module features the new Taper Fit Closure (TFC), which offers  Read More
14th Edition: Cleanroom Protocol Approaches for the Construction Process Print E-mail
Jul 02, 2001 at 04:56 PM

Allan D. Chasey, Del E. Webb School of Construction, Tempe, AZ, USA
Rajashekar Bistaiah, M.A. Mortenson Company, Colorado Springs, CO, USA

ABSTRACT

Contamination control, which has a direct impact on the productivity and profitability of the manufacturing process, is the central concept around which all cleanrooms are designed, built and operated. To help control construction contamination, two methodologies have been used: (1) clean the facility at the end of the construction, called "final super clean", or (2) continuous cleaning during construction, called "clean-build". The "clean-build" method is the most widely used contamination control method; however, very little is known about the actual benefit of the "clean-build" approach versus the "final super clean" approach.

14th Edition: Cleanroom Protocol Approaches for the Construction Process
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
14th Edition: ArF Lithography Options for 100nm Technologies  (02/07/2001)
14th Edition: A Comprehensive Approach for Delivery of Low-vapour-pressure Process Chemicals  (02/07/2001)
14th Edition: Competitive Strategy for the Semiconductor Industry - A Global Solutions Approach  (02/07/2001)
14th Edition: Facility Design & Environmental Protection  (02/07/2001)
10th Edition:Construction Challenges for the 300 mm Fab  (03/06/1999)

Related jobs
Facility Project Manager  (Salt Lake City, 08/01/2008)
System Design Engineer  (San Jose, 26/09/2007)
Electrical Design Engineer   (San Jose, 13/09/2007)
Purchaser  (Stuttgart, 24/08/2007)
Construction Engineer  (Stuttgart, 16/08/2007)
Download
300mm