Home arrow Cleanroom arrow Articles arrow Edition 29 arrow 29th Edition: Rapid tool installation: a process for all concerned
29th Edition: Rapid tool installation: a process for all concerned Print E-mail
Mar 09, 2006 at 09:45 AM

Kandi Collier, Intel Corporation, USA, Don Yeamen, M+W Zander, USA, Nick de Vries, Applied Materials, USA, Arnold Canales, Kinetics, USA, Dr Allan Chasey, Arizona State University, USA

ABSTRACT

The International Technology Roadmap for Semiconductors (ITRS) has defined several difficult challenges that will face the semiconductor industry over the next 10 to 15 years. As part of the challenge, the industry continues to demand facilities that are increasingly reliable, less expensive, faster to build and come on-line more quickly. At the same time, process equipment requirements, ESH compliance and factory operating flexibility continue to drive increased facility capital and operating costs. Process equipment installation time and costs continue to be driven higher by more gas, chemical and utility points of connection and ESH compliance requirements. As the industry develops new processes and process tools, design and construction firms will be challenged to continue to reduce the time to ramp factories to their full operating capacity. 

29th Edition: Rapid tool installation: a process for all concerned
Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
29th Edition: Litho metrology challenges for the 45nm technology node and beyond  (09/05/2006)
29th Edition: Copper deposition: challenges at 32nm  (09/03/2006)
29th Edition: Substrate cleaning and drying for semiconductor manufacturing  (09/03/2006)
29th Edition: Current issues in defect detection and review  (09/03/2006)
29th Edition: Reducing chiller system power consumption at PSC 12A  (09/03/2006)

Related jobs
Customer Engineer Manager  (Shanghai, 13/12/2007)
Technical Support Engineer III  (Santa Clara, 10/11/2007)
Process Engineer  (Richmond, 15/10/2007)
Intergration Engineer  (Tuscon, 14/09/2007)
Product Marketing Manager  (San Jose, 14/09/2007)
Blog
300mm