Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Cleanroom arrow News arrow Cleanroom arrow Silterra plans foundry ramp to 40,000wspm by year end
Silterra plans foundry ramp to 40,000wspm by year end Print E-mail
Apr 11, 2006 at 03:46 PM
Silterra Fab1 Silterra Malaysia Sdn. Bhd has announced that it plans to increase capacity in 2006 to meet customer demand from 130nm through to the 160nm node. The foundry expects to increase 200mm wafer starts from the current 33,500wspm to 40,000wspm by the end of 2006, which completes Fab 1 capacity expansion program, according to the company.

"We anticipated the increase in customer demand and expanded our capacity accordingly," stated Bruce Gray, Chief Executive Officer of Silterra.  "Even with the added capacity, our fab utilization rate is over ninety-five percent right now.  Our plan is to build out the fab to the maximum capacity of 40,000 wafer starts per month with state-of-the-art 0.13-micron equipment by year end.  We are ramping up volume on the 0.16-micron node, which will contribute to our revenue significantly for the rest of the year.  The present indications are that Silterra's business level in 2006 will be considerably above that of 2005."
 
 The main expansion program will be allocated to ramping its copper CMOS 130nm process. Its mask shrink only 160nm process is ramping for several consumer devices, while its 180nm copper process is currently at full production. Silterra started production at Fab 1 six years ago in 2000.


Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
Chartered Semiconductor raises capex & capacity for Fab 7  (26/01/2007)
Malaysian foundry Silterra switches to natural gas for fab energy  (14/09/2006)
Flash Partners to increase Fab3 capacity and capital equipment spending  (09/02/2006)
AMD to ramp Fab 36 aggressively  (12/10/2005)
Silterra demonstrates 130nm 8-Megabit SRAM  (04/02/2005)

Related jobs
Director, Back End Equipment Engineering at DayStar Technologies  (Newark, 18/07/2008)
Engineering Project Manager  (Alzenau, 28/03/2008)
Manager, Facilities and Support Services  (PERRYSBURG, 19/03/2008)
Site Director & GM  (South West UK, 06/03/2008)
Customer Engineer  (, 04/03/2008)
Blog
Subscribe
300mm