Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Wafer Processing arrow Articles arrow Edition 15 arrow 15th Edition: Process Control and Defect Inspection Strateg...
Flash Banner
15th Edition: Process Control and Defect Inspection Strategies for 300mm Fabs Print E-mail
Feb 02, 2005 at 04:04 PM

ANANTHA SETHURAMAN, SAGAR A. KEKARE, RAMAN NURANI & DADI GUDMUNDSSON, KLA-Tencor Inc., San Jose, CA, USA

ABSTRACT

The move to a smaller design rule and the associated processing methods are automatic by-products of the demand for ever more powerful ICs. As a result, there are some anticipated yield management challenges. Coinciding with the most recent IC design rule reduction is the long-awaited transition to 300 mm processing, which presents several unique yield management problems not emphasised before. Some of the process control and defect inspection methodology challenges associated with the 300 mm transition are summarised, and the fundamentals of surmounting them are discussed. Key conclusions are the potential emergence of new defect inspection points and the importance of including yield management in the fab planning process from the beginning.


icon 05 - Process Control and Defect Inspection Strategies for 300mm Fabs

Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
12th Edition: Full-Wafer Endpoint Detection Improves Process Control in Copper CMP  (03/02/2005)
14th Edition: A New Advanced System for Defect Identification on Unpatterned Wafers  (03/02/2005)
14th Edition: Interconnect Strategies and Deep Submicron CMOS Manufacture  (02/02/2005)
23rd Edition: 300mm activity report: April to July 2004  (01/07/2004)
22nd Edition: 300mm activity report: January to April 2004  (01/04/2004)

Related jobs
Yield/Defect Reduction Engineer  (Richmond, 15/10/2007)
Program Manager  (Silicon Valley , 15/09/2007)
Product Marketing Manager  (San Jose, 14/09/2007)
Customer support Engineer  (Newyork, 14/09/2007)
E Beam Site Engineer  (San Jose, 10/08/2007)
300mm