Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow Critical Components arrow Articles arrow Edition 28 arrow 28th Edition: The critical components of a production-wo...
28th Edition: The critical components of a production-worthy ALD system Print E-mail
Dec 14, 2005 at 04:49 PM

Jon Owyang, Jeff Bailey & Subrata Chatterji, Aviza Technology, Inc., CA, USA

ABSTRACT

Fundamentally,atomiclayer deposition (ALD) is a straightforward and tolerant deposition technique. Most chemical vapor deposition (CVD)  reactors (i.e. batch and single wafer) can be modified to deposit materials in an ALD mode. However, the critical barriers in making ALD a production-worthy process lies in the challenge of processing films in ALD mode that is quick enough to meet the technical film requirements for uniformity, step coverage, defect density and electrical properties. The design of the liquid/gas delivery/distribution system, the chamber and exhaust mechanism are the key differentiators between R&D tools vs. high-volume manufacturing tools. 

28th Edition: The critical components of a production-worthy ALD system

Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
29th Edition: Measurement of conservation of energy by semiconductor manufacturing equipment  (09/03/2006)
28th Edition: In-line metrology and control of gas mixtures in semiconductor processing applications  (14/12/2005)
27th Edition: Easy vacuum solution for the load locks in the DEPx coating system  (21/08/2005)
24th Edition: The current state of the robotics industry  (11/12/2004)
17th Edition: Cost reductions from water conservation efforts at Motorola  (10/09/2002)

Related jobs
Solar Applications/Systems Engineer  (Sunnyvale, 04/04/2008)
Senior Engineering Project Manager  (Bangalore, 21/02/2008)
Product Marketing Engineer IV  (Santa Clara, 17/09/2007)
Engineering Project Manager II (tool owner- Product Marketing Engr. Staff)  (Santa Clara, 17/09/2007)
Product Engineer IV (Bus Mgt- Product Marketing Engr. Staff)  (Santa Clara, 17/09/2007)
Subscribe
300mm