Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
Home arrow EHS arrow Edition 28 arrow 28th Edition: Designing sustainable water systems in semiconductor fabs
EHS Product Briefs   RSS Feed
TecHarmonicProduct Briefing Outline: TecHarmonic Inc. has launched the Alpine-S, claiming that it is the industry's first and only point-of-use (PoU) gas abatement system with the capability to abate  Read More
Product Briefing Outline: Silicon Skunkworks Inc. has launched the RB3S, a silane flash arrestor device that is placed inline on operating Sih4 gas lines. If a breach occurs in the line, the  Read More
Product Briefing Outline: The INFICON UL5000 Helium Leak Detector is designed to meet the most critical and demanding leak detection applications. Featuring INFICON's proprietary software algorithms I-CAL and Hydro-S in a field-proven vacuum design, the UL5000 provides testing flexibility, high sensitivity and quick accurate results  Read More
28th Edition: Designing sustainable water systems in semiconductor fabs Print E-mail
Dec 14, 2005 at 04:38 PM

Pablo Ruiz, RFAB Process Waters and Drains Project Manager, Texas Instruments, Dallas, Texas, USA

ABSTRACT

In the first quarter of 2004, TI began design of its new wafer fabrication facility in Richardson, Texas, five miles north of the main Dallas campus. We reexamined how to competitively build and operate this new facility and reconsidered all of our old paradigms of how we should build a wafer fab. By the end of the design process we determined that we could  build a competitive fab while reducing first costs and ongoing operational costs. In this article I will be discussing some of these  design elements in TI's newest fab we now call RFAB. 

28th Edition: Designing sustainable water systems in semiconductor fabs

Readers' comments



Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
28th Edition: Design and process limited yield at the 65nm node and beyond  (14/01/2006)
28th Edition: Backside and edge/bevel defectivity concerns and yield-enhancement opportunities  (14/01/2006)
28th Edition: 300mm activity report August to November 2005  (14/01/2006)
28th Edition: Front end surface preparation challenges and solutions for 65 and 45nm nodes  (14/12/2005)
28th Edition: FEOL and BEOL applications of X-ray metrology  (14/12/2005)

Related jobs
Systems Engineer  (Camarillo, 25/06/2008)
Senior Building Services Engineer   (Greenock, Scotland, 16/04/2008)
Business Development Manager Electricity Metering  (, 08/04/2008)
Facility Project Manager  (Salt Lake City, 08/01/2008)
Applications Development Engineer  (Milipitas, 09/08/2007)
Blog
300mm