Home
News
Blogs
Fabtech Jobs
Product Briefings
Going Places
300mm Activity Reports
Core Sections
Wafer Processing
Lithography
Fab management
Materials & Gases
Critical Components
Cleanroom
EHS
 
Find

GlobalSpec - The Engineering Search Engine
 
24th Edition: 300mm Activity report July to September 2004 and trends update Print E-mail
Oct 01, 2004 at 05:17 PM
Mark Osborne, Editor-in-chief, Semiconductor Fabtech

ABSTRACT

With the semiconductor industry reaching the peak of the current up-turn a significant number of 300mm fabs will come online in 2004. Currently, the number of fabs preparing to tool install during 2005 is closely tracking the record number expected in 04. This activity report will cover in-depth, the trends now taking place and the potential impact in the 2005 period. Updates are also given on the battle for 300mm capacity in the foundry market as well as ramp rate analysis of fabs dedicated to memory production.
icon 02 - 300mm activity report: July to September 2004 & trends update

Bookmark with:
DeliciousDiggredditStumbleUpon

Visit Fabtech Jobs websiteSubscribe to Fabtech weekly newsletter

Related articles
30th edition: 300mm activity report: April 2006 to June 2006  (24/08/2006)
25th Edition: 300mm activity report October to December 2004  (18/02/2005)
15th Edition: Process Control and Defect Inspection Strategies for 300mm Fabs  (02/02/2005)
23rd Edition: 300mm activity report: April to July 2004  (01/07/2004)
22nd Edition: 300mm activity report: January to April 2004  (01/04/2004)

Related jobs
Senior Analog/Mixed Mode Design Engineer  (Touluse, 18/06/2008)
Engineering Project Manager  (Alzenau, 28/03/2008)
Equipment Engineer  (Richmond, 15/10/2007)
Business Process Sales Systems Analyst  (San Jose, 14/09/2007)
Business Process analyst  (San Jose, 05/09/2007)
Blog
Download