|
Jun 27, 2008 at 04:16 PM |
Mark Durcan, President and Chief Operating Officer of Micron Technology said in a conference call with financial analysts covering its financial third quarter results that its capital spending for its fiscal 2008 would end up being on the high side of its previous guidance of between $2.5 billion and $3 billion. Write Comment (1 comments) |
|
Read more...
|
|
|
Jun 27, 2008 at 03:38 PM |
ANGSTREM is to convert and existing fab to 200mm wafer production with the construction of support buildings and full conversion expected to be completed by the end of 2009. M+W Zander FE GmbH has been awarded the contract that is expected to cost approximately €150 million. Write Comment (0 comments) |
|
Read more...
|
|
|
Apr 30, 2008 at 06:06 PM |
|
TSMC has said that capital spending for 2008 will be approximately $1.8 billion, down from its revised final figure in 2007 of $2.6 billion, a 31 percent decrease year-on-year. Executives had previously stated that CapEx for 2008 would be significantly lower than the figure for 2007 but had not guided to specific levels. Write Comment (1 comments) |
|
Read more...
|
|
|
Apr 25, 2008 at 04:07 PM |
|
Chartered Semiconductor’s overall fab utilization rates have climbed from 70 percent in 1Q07 to 86 percent in 1Q08 and are expected to top 88 percent in 2Q08, the company noted in its first quarter 2008 financial results. Write Comment (0 comments) |
|
Read more...
|
|
|
Apr 21, 2008 at 09:41 AM |
|
As mentioned in Micron Technology’s most recent quarterly financial conference call, the deal with Nanya Technology on sub-50nm DRAM design and process technology - signed in March - has progressed to include a new 300mm DRAM manufacturing joint venture, dubbed MeiYa Technology Corporation. Write Comment (0 comments) |
|
Read more...
|
|
|
Apr 15, 2008 at 03:25 PM |
|
Process piping solutions provider NEHP, Inc. has moved its production facilities to a new 15,000 square-foot building in Williston, Vermont. With cleanrooms of class 1,000 and 10,000 and two demarcated fabrication and production areas in the building, the move also holds the promise of further expansion with permits for the addition of a further 10,000 square feet. Write Comment (0 comments) |
|
Read more...
|
|
|
Apr 08, 2008 at 05:10 PM |
|
Powerchip Semiconductor Corporation (PSC) has officially broken ground on its next two 300mm fabs, dubbed P4 and P5, at an estimated combined cost of approximately $8.2 billion. Each fab will have a capacity of 60,000 wafer starts per month (wspm) when fully ramped. Write Comment (3 comments) |
|
Read more...
|
|
|
Apr 03, 2008 at 02:46 PM |
|
Mark Durcan, Micron Technology’s President and COO, said during a conference call with financial analysts that the company would be delaying the production start of its IMFT joint venture 300mm fab, currently under construction in Singapore. Write Comment (0 comments) |
|
Read more...
|
|
|
Apr 01, 2008 at 01:42 PM |
Following quickly on heels of news that Hynix Semiconductor would cut capital spending in the second half of 2008 by approximately $1 billion, the Korean memory manufacturer, as reported by Reuters, is to delay the production ramp of its newest 300mm fab, M11 by a quarter. M11 is a NAND flash memory fab. Write Comment (0 comments) |
|
Read more...
|
|
|
Mar 06, 2008 at 06:12 PM |
|
Spansion has said that it has reached a ramp of 25,000 wafer starts per quarter at its 300mm fab (SP1) in Japan, producing 65nm MirrorBit NOR flash devices. Spansion is currently the only NOR flash memory manufacturer using 300mm wafers and migrating to the 65nm half-pitch node. Write Comment (0 comments) |
|
Read more...
|
|
|
|
<< Start < Previous 1 2 3 4 5 6 7 8 9 10 Next > End >>
|
| Results 1 - 14 of 186 |